Kitchen and bathroom remodels are where electrical work most often gets underestimated. Homeowners plan the cabinets, the countertops, the tile — and then discover partway through that the electrical side needs far more attention (and budget) than expected.
Here's what to check before you start demo, not after.
1. Does Your Panel Have Capacity for New Circuits?
A modern kitchen remodel often adds several dedicated circuits: one for the microwave, one for the dishwasher, one for a garbage disposal, GFCI-protected countertop outlets, and sometimes a circuit for a range or induction cooktop. If your panel is already near capacity (see our panel upgrade guide), this needs to be addressed before cabinets go in, not after.
Finding out mid-remodel that you need a panel upgrade is far more disruptive (and sometimes more expensive) than planning for it from the start.
2. GFCI and AFCI Requirements
Maryland's electrical code (based on the National Electrical Code) requires GFCI protection in kitchens, bathrooms, garages, and outdoor outlets, and AFCI protection in most living areas. If your home predates these requirements, a remodel is often the trigger point that requires bringing affected circuits up to current code.
3. Where Are Your Outlets Actually Going?
Once cabinets, an island, or a vanity go in, outlet placement is locked in for years. This is the point to think through: island outlets, under-cabinet lighting circuits, a dedicated outlet for a future EV charger if you're also updating your garage, and USB or smart-home-ready outlets if that's a priority.
4. Permits Are Not Optional
Electrical work done during a remodel requires a permit in Maryland, and it should be inspected. Unpermitted electrical work can create real problems at resale — buyers' inspectors routinely catch it, and it can also affect insurance claims if there's ever an electrical fire, even one unrelated to the specific work done.
5. Timing Your Electrician Alongside Other Trades
Electrical rough-in typically needs to happen after framing changes but before drywall goes back up. Coordinating this with your general contractor or the other trades on the job (plumber, drywall, cabinet installer) avoids costly delays and rework.
The Bottom Line
Bring in a licensed electrician during the planning phase of your remodel, not after demo has started. A short consultation upfront can prevent expensive surprises and delays later.